DM 45 FC – Copy Actual Periods
The following has been taken from the Tax Provision Blueprint "Instruction Guide" starting at page 212.
See KB article: "Tax Provision Blueprint Instruction Guide - PV7.3.0 SV100"
See KB article: "Data Integration"
Dashboard DM 45 FC – Copy Actual Periods
- This schedule is only for Forecast scenarios and is only used on the GLTaxAdmin workflow for country level workflows (i.e.: US Local: Copy data).
- Select a base level entity or a parent entity. The copy/clear BR’s will run for all base level entities for that entity selected.
- Select the source scenario where you want the data to come from.
- In the toolbar, you will see:
- the destination scenario based on your workflow POV
- the number of periods that will be copied – this is based on the destination scenario’s Text 2 field
- There is only one section to this schedule.
- The Data Copy Steps
- You can execute each step individually or for all steps at once.
- A date and time stamp (including the source scenario) are added for informational purposes for each step after the copy BR executes. The data and time stamps are removed when a “Clear” is executed.
Updated 9 months ago
Version 2.0