Moving an entity between cubes
3/5/2019
Moving an entity between cubes
Hi, a partner has an entity structure with four sub-groups. Each of these sub-groups has a different cube (i.e. four cubes).
Now, apparently, they need to move one entity from sub-group 1 (and cube 1), to sub-group 2 (i.e. cube 2).
The cubes are set up to cater for extensibility in BUD and FC in later phases, i.e. nothing has been extended yet, so the dimensionality of cube 1 and cube 2 is the same, apart from the different entities.
My approach would be, keep entity ABC in cube 1 and create a new entity called something like entity ABC-new in cube 2.
However, the partner wants to move the entity ABC from cube 1 to cube 2 completely, which I do not think is feasible, because you would change the historical data of that entire sub-group 1 as well as 2.
Now my question: Has anyone done that before? Is there another feasible way other than my approach? Even if we say we do not care about the historical data of the sub-groups, is it possible to move an entity between cubes without messing with the system?