The OneStream Community is temporarily frozen until June 29th due to the ongoing maintenance. Please read the blog post here to learn more.
Forum Discussion
marisolbritton
1 year agoNew Contributor III
Drillback to stage slow after upgrade and switching to SIC connector
We upgraded to 8.2.2 last month and switched our data connector to the SIC connector. Since upgrading all our drilldown cube views (to stage data) have been loading slow. Most of them used to load instantaneously. Now some take 5-15 minutes to load. Has anyone had this issue? I have an open ticket with support. They ran indexing and that helped but just a bit. Thanks in advance.
1 Reply
- SimonHesfordContributor II
SIC isn't involved in drilldown operations only drillback, so I wouldn't focus on that.
Related Content
- 9 months ago
- 1 year ago