OrgByperiod/ Restructuration d'entités
hello team,
new in OS , i need help if someone works on this tool.
i am wondering if there is an equivalence of the hfm functionality "org by period" in OS ?
is it possible in OS to manage the structure on a “Time sensitive” basis, and to have effective dates for changes ? i am aware that it's possible to do the changes of % of ownership or even change of type of ownership (full Conso, equity...) by period but am wondering if it will be possible if a change of the parent of the entity and having two hierarchies existing on the same cube/app
thank you in advance
TomABC - I think I found the solution. Here we go.
1. If you have 2 Cube Summary and Base Cube.
2. Set the Org By Period in the Summary Cube Settings.
3. Add the Relationship in the Entity Dimension that is tagged to the summary Cube.
4. Update the Consolidation% in the Entity Dimension that is tagged to the Summary Cube Relationship property.
5. In the Base Cube Entity Dimension the relationship property can be 100% consol.