Central Import Status
Hey,
So I am testing the Workflow Name "Central Import" since I recall it from Designing an application course. But I have a hard time understanding how to change status on the profiles after data have been loaded for the entity.
This is my current setup:
My regular "Import, Validate, Load" where I can load unassigned entities.
Below is my "Central Import" Workflow step in another location with the assigned entity. And you can see that it is indication that data has been loaded through the "central" load step. However status is gray and wont change even if i certify central load step or the parent level.
Or am I configuring this in the wrong way maybe? 🙂
Thx in advance
Jones - See below from the Design Guide, it is working as expected.
Central Input
For corporate configurations there is an option called Central Input. This can be used for
situations where corporate does the final adjustment after the data has been loaded by the sites.
The Workflow Channel can configure with Central Input which will then display a grey check mark
for that Workflow Channel. This allows corporate to make updates and adjustments at the top
level because the Workflow owns the Entity. All activity is tracked in the audit history.