Waterfall Chart in BI Viewer?
Has anyone been able to build a waterfall chart in BIViewer? I feel like this is something that I should be able to be done, but I can't find anything on it. Anyone know if this can be done? I know there is an advanced chart for waterfalls. ThanksSolved2.6KViews0likes3CommentsHow to make the column names dynamic in BI-Viewer pivot or Grid
Hello, I am facing a problem in making dynamic names for BI-viewer. I have a data adapter with Command type as Cube view. I am using this adapter in BI-viewer. I want to make the column names similar in cube view. For example, in my scenario I have columns changing according to the time. but here it will show as Col0Value, Col1Value. As per cube view headers, Col0 is 2024M1 and Col1 is 2024M2 and this will change according to time updated for next periods. It will not be same every time. How to get the same names as per cube view into BI-viewer column list.814Views2likes2CommentsBasic Question about BI Viewer and Cube View MD data source Column Expression
I have a Cube View with three Account dimension columns - Net_Rev, Std_Cost, and a CVC calculated division column to calculate Std_Margin (Std_Cost/Net_Rev). Rows are a UD dimension representing the Product. In my Dashboard, I have a Cube View MD Data Adapter using this Cube View as the data. When I add a BI Viewer Pivot Grid, I want to display the same three columns - Net_Rev, Std_Cost, and the calculated column. I see CalcScript in the Pivot Grid's Data Source dimensions. How do I use it in the Pivot Grid to display the calculation that the Cube View was doing for that third column? I thought I might reference it in the Value filter along with the two Accounts, but it doesn't appear as a column in the Pivot Grid.145Views0likes5CommentsHow to Create an End-User Editable Text Box in BI Viewer Accessible From OnePlace?
I’m trying to create a text box component that can be added to a BI Viewer and easily updated by end users directly in OnePlace. The goal is for the users to be able to edit the text without having to modify anything in the underlying application or configuration. Here’s what I’ve attempted so far: Created a string parameter intended to store the text. Tried adding a dashboard parameter control (such as a text box) linked to that parameter. Embedded it into the BI Viewer view. However, this approach didn’t yield the desired result. The text either doesn’t update as expected, or isn’t visible to the user in the way I intended. Has anyone successfully implemented a user-editable text box that can be directly manipulated by end users in OnePlace and reflected in a BI Viewer component? Any guidance, best practices, or examples would be greatly appreciated! Thanks in advance for your help.17Views0likes0CommentsBi Designer
Working with BI Designer and cannot get the Time order in place sequentially. The Cube View data source is pulling the correct time, data, alongside the POV for workflow. The WF filter builder is in order. However, cannot get the two months (Oct and Nov) in the appropriate place. Tried to sort and use Start/End Dates too in settings for WF Time Filter: T#WF, T#WFPrior1, T#WFPrior2, T#WFPrior3, T#WFPrior4, T#WFPrior5, T#WFPrior6, T#WFPrior7, T#WFPrior8, T#WFPrior9, T#WFPrior10, T#WFPrior11, T#WFPrior12, T#WFPrior13 Has anyone experienced this before?Solved190Views0likes2CommentsBi Viewer not rendering charts when it refer in Dashboard (V8)
Hi, we are in the process of migrating into V8. while testing some of the dashboard we observe that BI Viewer is not rendering charts when it refers to dashboard. when running alone BI Viewer it is working fine. can you anybody please help me this on priority . is there any option to enable? working fine on 7.1. Thanks.142Views0likes3CommentsDrill down Chart in BI Viewer.
Hi I have a problem with dril Down in BI Viewer. Part of our UD1 is as follows: BU1000 - EGMONT GROUP BU1500 - Other Business line BU6000 - HOLDING AND SERVICE BU6100 - HOLDING COMPANIES I have done the following: 1: Cubeview Cubeview exportet to excel gives this Please notice that top level BU1500 do not aggregate the data. And this is correct, totally 1.7. 2: Dataadapter: Pivot in BI Viewer looks like this: My drill down in Charts i BI viewer looks as follows: Start: Total 5.1 Drill first level: Total 5.1 Drill second level: Total 3.4 The red box should not be there Drill third level: Total 1.7 The red box should not be there Drill forth level: Entity level (sums up to 1.7) My questions are as follows, hopefully answering one solves all… 1: I can see in the pivot tablet has the amounts three times. (1.7+1.7+1.7=5.1) where it should be 1.7. This is also giving errors in the charts. How can I avoid this? 2: In the charts I have some ”Ghost” totals as they have one bar for the specification and one bar as a total. How can I avoid this. (the red markings) 3: If a subdivision has 5 sub-subdivisions then entity specifications is 5 click. If another subdivision only has 3 sub-subdivisions, the I still need to click 5 times. Any way to avoid this. (Yes this is icing on the cake)Solved904Views0likes11Comments