incorrect scenario running scheduled job using WFScenario parameter
Currently, we have a manual process that involves a user running a Load and Transform that uses a data source with a DM Sequence as its source. That sequence uses the |WFScenario| parameter.
This all works great until we try to schedule it.
I pass the scenario and the time in with a parameter at the Sequence level. The first step takes this parameter (e.g., Scenario=BudgetFinal) and creates a trigger file in the Batch folder and runs ExecuteFileHarvestBatch. The correct workflow executes but appears to be pulling its data (via that first DM Sequence/Data Source using WFScenario) from my current, user WF/POV.
I've tested this by navigating to correct WF/Scenario, then running the DM job I want to schedule and the data successfully imports. If I then navigate to a different scenario and run the same DM job again, the import fails with the error that there is no data.
I would expect the WFScenario parameter to use the scenario of the WF that is specifically calling the parameter but that doesn't appear to be the case.
Is there a fix here? Am I just using the wrong parameter?
Alright, si.PovDataCellPk still failed but it did inspire me to check other parts of si and this solves the problem:
si.WorkflowClusterPk.ScenarioKey = BRApi.Finance.Members.GetMemberId(si,DimTypeId.Scenario,scenario) si.WorkflowClusterPk.TimeKey = BRApi.Finance.Time.GetIdFromName(si,year) si.WorkflowClusterPk.ProfileKey = BRApi.Workflow.Metadata.GetProfile(si,wfName).UniqueID
The profile key override isn't strictly necessary for the export/import part of this but there's additional downstream code that looks at the staged results and for that the WF key is relevant. I've shipped this off to my users for testing but it appears to be good for now.