Forum Discussion
Hi Denise, thank you for testing. I would not execute this in PROD then. We will look into this and see if there is a better solution to retain the correct calendar view and have the task execute at the desired time.
I think Jack may be onto something. Unfortunately I was not able to test the theory of doing an iis reset to see if that would update the display on the Task Scheduler calendar to show them at the time they were actually executing. (showing at 8am, scheduled for 8am, but task was starting at 9am). If an iis reset corrected how they were shown in Task Scheduler then it would have worked to change the times by an hour. I was not able to do an iis reset until evening and had to get all the tasks back on the right schedule prior to that. I did open a case with OS Support and was told it was a bug and that I would need to go into each task and edit the task to a start date after the time change. I think that may have been another part of my issue - my tasks were recurring daily with the time change happening inside the recurring window. I will have to wait til fall and at that point will probably schedule an iis reset to happen early Sunday morning after the time change.
Thank you
Denise
Related Content
- 11 months ago
- 8 months ago
- 10 months ago